↓ Download PDF ← Back to Library

Antioch University-wide ILL/DD Library Services – Budget Narrative
Prepared by Laurien Alexandre
January 16, 2007

1 time Start-up Costs
Per Campus
$2,500 for ILL/DD & e-reserve system set-up (@100hrs of C. Boswell’s time)
$1,000 for one trip (Cathy or Marcy) for trip to campus if/as needed

1 time for University Datatel Authentication
$1,500 is estimate by C. Santell for creation of system-wide authentication process.

Annual Cost per Campus/Unit
ILL/DD staffing
• 06-07 (for 5 months, divided by 4 participating units)
This figure includes 1 fulltime ILL-DD specialist plus 5% of Cathy’s time for 4 units, plus a stipend for university service that goes to the ANE president to disperse

• 07-08 (Full year costs divided by 5 participating units – 3 West Coast, McGregor & PhD)
This figure includes 1 fulltime ILL-DD specialist plus 25% of Cathy’s time plus a stipend for university service that goes to the ANE president to disperse

• 08-09 (Full year costs divided by 6 participating units – 3 West Coast, McGregor, College & PhD)
This figure includes 1 fulltime ILL-DD specialist plus 25% of Cathy’s time, both with a 3% cost-of-living increase, e plus a stipend for university service that goes to the ANE president to disperse

• 09-10 (Full year costs divided by 6 participating units)
This figure includes 1 fulltime ILL-DD specialist, a half time staff person starting in January (assuming transactions merit the increased staff) plus 25% of Cathy’s time, both with a 3% cost-of-living increase, plus a stipend for university service that goes to the ANE president to disperse

Transaction costs on campus (Guess-estimate on # of campus-based transactions
$500 CLIO is a set fee.
OCLC is an estimate based on additional transactions, and is increased each year. This may be a high estimate of the amount a campus would spend.
Shipping/supplies is an estimate and assumes increase of transactions each year. This may be a high estimate of the amount a campus would spend.
Adobe Professional License is a set amount. It may be increased in future years.

Overhead to ANE
For purposes of this budget projection, a 1% of ANE total’s library budget is proposed per participating unit. For 06-07, this amount is pro-rated fro five months. The ULC needs to decide the approach for overhead for services such as this. Should it be a flat 1%? Or should it be FTE so a small unit like Santa Barbara or the PhD is not paying the same as LA or McGregor? Should FTE be further detailed differentially based on undergraduate, masters and doctoral students ?

This site is not affiliated with Antioch College, Antioch University, or the Antioch College Alumni Association. It is provided as a service to the Antioch College community to provide resources to inform people about the current situation at the college and what can be done to save the college before it's too late.